inspected by [_____] Division, Naval Facilities Engineering Command. Ten
days advance notice is required for scheduling the inspector to conduct
acceptance operational test and inspection.
3.3
SCHEDULE
Some metric measurements in this section are based on mathematical
conversion of inch-pound measurements, and not on metric measurements
commonly agreed on by the manufacturers or other parties. The inch-pound
and metric measurements shown are as follows:
Products
Inch-Pound
Metric
a.
Capacity
= 500,000 Btu/hr
= 150 kW
= 10,000,000 Btu/hr
= 2930 kW
= 18,000,000 Btu/hr
= 5275 kW
-- End of Section --
SECTION 15516N
Page 29