3.4.1.2
Acceptance Operational Test and Inspection
**************************************************************************
NOTE: Insert the appropriate Engineering Field
Division.
**************************************************************************
Conduct a preliminary operational test prior to requesting an acceptance
operational test and inspection by a [_____] Division, Naval Facilities
Engineering Command Boiler inspector. The Contracting Officer, upon
receipt of the notice from the Contractor, shall request the boiler be
inspected by [_____] Division Naval Facilities Engineering Command.
Fifteen days advance notice is required for scheduling inspector to conduct
acceptance operational test and inspection.
3.5
SCHEDULE
Some metric measurements in this section are based on mathematical
conversion of inch-pound measurements, and not on metric measurements
commonly agreed on by the manufacturers or other parties. The inch-pound
and metric measurements shown are as follows:
Products
Inch-Pound
Metric
a.
Alarm Bell
Diameter
= 4 inches
= 100 mm
b.
Stack Thermometer
Scale Range
= 150-750 degrees F
= 66-399 degrees C
-- End of Section --
SECTION 15514N
Page 15