provided:
1. NFPA 54 Scope: "1.1.1 Applicability: ...
delivery to the connections with each gas
utilization device. For other than indicated
liquified petroleum gas systems, the point of
delivery is the outlet of the service meter
assembly, or the outlet of the service regulator or
service shutoff valve when no gas meter is provided.
For undiluted liquified petroleum gas systems, the
point of delivery is the outlet of the first stage
2. ASME B31.8 Scope: "802.11... This code covers
the design, fabrication, installation, inspection,
testing and safety aspects of operation and
maintenance of gas transmission and distribution
stations, gas metering and regulation stations, gas
mains, and service lines up to the outlet of the
customer's meter set assembly....802.14 This code
does not apply to....(c) piping beyond the outlet
of the customers meter set assembly..."
**************************************************************************
Inspect for compliance with [NFPA 54] [and] [ASME B31.8].
Replace, repair,
and then re-inspect defective welds.
3.2.2
PE Fusion Welding Inspection
Visually inspect butt joints by comparing with, manufacturer's visual joint
appearance chart. Inspect fusion joints for proper fused connection.
Replace defective joints by cutting out defective joints or replacing
fittings. Inspect 100 percent of all joints and reinspect all corrections.
Arrange with the pipe manufacturer's representative in the presence of the
Contracting Officer to make first time inspection.
3.2.3
Pressure Tests
**************************************************************************
NOTE: To assist the designer in selecting the
proper documents for a specific project, the
following scope in accordance with documents is
provided:
1. NFPA 54 Scope: "1.1.1 Applicability: ...
delivery to the connections with each gas
utilization device. For other than indicated
liquified petroleum gas systems, the point of
delivery is the outlet of the service meter
assembly, or the outlet of the service regulator or
service shutoff valve when no gas meter is provided.
For undiluted liquified petroleum gas systems, the
point of delivery is the outlet of the first stage
2.
ASME B31.8 Scope:
"802.11...
This code covers
SECTION 15195N
Page 18