testing procedure. Chains or metal ropes shall not be used in lifting the
pipe for testing. Labor, materials, and equipment necessary for conducting
the holiday tests shall be furnished by the Contractor.
3.9.4
Equipment Acceptance Tests
**************************************************************************
NOTE: Write detail acceptance test for each item of
equipment using the latest state of the art.
**************************************************************************
3.9.5
System Acceptance Test
**************************************************************************
NOTE: Write a detailed acceptance test for system
operation and issue fuel quality. Aircraft direct
fueling systems should be able to issue design flow
rates at specified minimum pressures. Aircraft fuel
quality issue shall meet use limits contained in
NAVAIRINST 10340.3, "Maintaining Quality and
Limiting Contaminating of Aircraft Fuels" available
from NAVAIRHQ (AIR 5363) AV 222 2653. In general
fuel to aircraft limit on freewater is 5ppm and 2
mg/liter on particulates.
**************************************************************************
3.10
FIELD PAINTING
After completion of field inspections and tests, clean and paint carbon
steel surfaces exposed to the weather and in manholes, including valves,
strainers, traps, flow meters, piping flanges, bolts, nuts, washers, pipe
hangers, supports, expansion joints, and miscellaneous metal. Do no paint
stainless steel or aluminum surfaces. Clean surfaces to remove dust, dirt,
rust, oil, and grease. Apply two coats of enamel paint to a total minimum
dry film thickness of 0.051 mm 2 mils. Apply the second coat of paint
after the preceding coat is thoroughly dry.
-- End of Section --
SECTION 15194N
Page 36