Size (mm)
Under
40
50
80 100 150 200
250
300
-------------------------------------------------------------------------
Maximum Hanger
Spacing (meters)
2
2.75
3 3.5 4.25
5 5.75 6.50 7.0
__________________________________________________________________________
Nominal Pipe
One and
Size (Inches)
Under
1.5
2
3
4
6
8
10
12
--------------------------------------------------------------------------
Maximum Hanger
Spacing (Feet)
7
9
10
12
14
17
19
22
23
3.3.3
Anchors, Bolts, Nuts, Washers, and Screws
Install where required for securing the work in place. Sizes, types, and
spacings of anchors and bolts not indicated or specified shall be as
required.
3.4
PROTECTIVE COATINGS FOR ABOVEGROUND CARBON STEEL PIPING
For aboveground piping, coat piping and appurtenances in accordance with
Section 09971 EXTERIOR COATING OF STEEL STRUCTURES.
3.4.1
Damaged Materials
For both above and below ground piping, fittings, couplings, irregular
surfaces, damaged areas of pipe coating, and existing piping affected by
the Contractor's operations shall be clean, dry, grease free, and primed
before application of tape. Waterproof shrink sleeves may be provided
using electric heating method in lieu of tape and shall overlap the pipe
coating not less than 150 mm 6 inches. Pipe coating and adhesive undercoat
surfaces to be wrapped with tape shall be primed with a compatible primer
prior to application of tape. Primer shall be as recommended by tape
manufacturer and approved by pipe coating manufacturer. [Apply pipe
coating on piping under piers with finish paint coat as approved by pipe
coating system manufacturer.]
3.4.2
Pipe Coating
For both above and below ground piping, residual material from pipe coating
shall be pressed into the break or trimmed off. Apply tape spirally with
one-third overlap as tape is applied. A double wrap of one full width of
tape shall be applied at right angles to the axis to seal each end of the
spiral wrapping.
3.4.3
Fitting Coating
For both above and below ground piping, stretch and apply first layer of
tape to conform to component's surface. Apply and press a second layer of
tape over first layer of tape.
3.4.4
Flange, Valve and Irregular Surface Coating
For both above and below ground piping, apply coal tar base coating to a
minimum dry film thickness of 0.80 mm 30 mils.
3.4.5
Exterior Coatings for Underground Piping
Except as otherwise specified, protective coating shall be applied