equipment schedule or specifications, and location
of temperature and/or pressure sensors.
2. System Terminal Unit detail providing location
of all piping including valves, strainers, flanges,
fittings, connections, and supports (coordinate with
Section 15185 and Section 15183).
3. Single line plan and any necessary sections
indicating location, sizes, and routing of all
associated piping.
4. Appropriate schedules for equipment, including
any reset schedules.
5. This section requires connections to existing
high or medium temperature water piping that may
contain asbestos insulation or associated material.
Provide plans for removal and disposal of such
material.
6. Detail of connections to existing high or medium
temperature water piping, including air chambers and
vents as required.
Since the hot water heat exchanger and associated
hot water piping is specified in Section 15185, and
high or medium temperature water piping herein,
coordination for the heat exchanger details
indicating arrangement of piping is necessary.
Avoid redundancy between Section 15184, Section
15185, and other related specifications sections.
When paragraph entitled "Pressure Gages" is used,
provide auxiliary piping and accessories in other
element (sensor), and auxiliary piping and wiring,
alarms, controllers, and flow switches.
When paragraph entitled "Indicating Thermometers" is
used, coordination with Section 15183 and other
related sections is necessary. Designer must
provide specifications for the following accessories:
1.
Feedwater pump(s).
2. Condensate receiver.
3.
Blowdown tank.
4.
Chemical feed.
5.
Makeup water.
6.
Auxiliary piping & wiring.
7. Magnetrol water column pump controller/low water
cutoff.
8.
Proportional pressure controller with pressure
SECTION 15184N
Page 17