Record drawings; G
1.5
QUALITY ASSURANCE
**************************************************************************
NOTE: The qualifications clause in this guide
specification has been approved by NAVFACHQ in
accordance with the requirements of NAVFAC P-68. The
paragraph in this guide specification may be used
without any other NAVFACHQ approval or request for
waiver.
**************************************************************************
1.5.1
Record of Prior Installations
Prior to installation, submit data showing of Halon fire extinguishing
systems of the same type and design as specified herein. The data shall
include the names and locations of at least two locations where the
Contractor has installed such systems. The Contractor shall indicate the
type and design of these systems and certify that these systems have
performed satisfactorily in the manner intended for a period of not less
than 18 months.
**************************************************************************
NOTE: For projects administered by the Pacific
Division, Naval Facilities Engineering Command,
include the following optional paragraph requiring
the minimum qualification of a NICET Level-III
technician for preparation of all fire protection
system drawings.
**************************************************************************
[Qualifications of System Technician: Installation drawings, shop drawing
and as-built drawings shall be prepared, by or under the supervision of, an
individual who is experienced with the types of works specified herein, and
is currently certified by the National Institute for Certification in
Engineering Technologies (NICET) as an engineering technician with minimum
Level-III certification in Special Hazard System program. Contractor shall
submit data for approval showing the name and certification of all involved
individuals with such qualifications at or prior to submittal of drawings.]
Contractor shall have successfully installed Halon fire extinguishing
systems of the same type and design as specified herein.
1.5.2
Halon Fire Extinguishing System
When preliminary field tests have been completed and all necessary
corrections made, submit to the Contracting Officer a signed and dated
letter attesting to the satisfactory completion of testing and stating that
the systems is in operating condition. The letter shall include a written
request for a formal inspection and test.
1.5.3
Manufacturer's Representative
Provide the services of a manufacturer's authorized representative or
technician, experienced in the installation and operation of the type of
system being provided to supervise the installation and testing, including
SECTION 13966N