Proposed test procedures for final acceptance test, at least 2
weeks before the start of related testing. Proposed test schedule
for acceptance test, at least 2 weeks before the start of related
testing.
Field Training
Proposed schedule for field training, at least 2 weeks before
SD-06 Test Reports
Preliminary Tests
Test report for the preliminary tests in booklet form, upon
completion of testing. Report shall document test results
including repairs and adjustments made, and final test results.
Final Acceptance Tests
Test report for the final acceptance tests in booklet form, upon
completion of testing. Report shall document test results
including repairs and adjustments made, and final test results.
The weight of each storage container shall be recorded before
final acceptance test and after test has been completed and
containers recharged.
SD-07 Certificates
Installation Technician[; G][; G, [_____]]
Concurrent with statement of similar services, manufacturer's
certification of installation technician.
Installation Drawings[; G][; G, [_____]]
Concurrent with installation drawings, manufacturer's
certification of installation drawings.
SD-10 Operation and Maintenance Data
Wet Chemical Fire Extinguishing System
[Six] [_____] manuals listing step-by-step procedures required
for system actuation (automatic and manual), recharging, and
routine maintenance, at least 2 weeks before field training. The
manuals shall include the manufacturer's name, model number, parts
list, list of tools and parts that should be kept in stock by the
owner for routine maintenance including the name of a local
supplier, simplified wiring and control diagrams, troubleshooting
guide, and recommended service organization (including address and
telephone number). Service organization shall be capable of
providing [4] [_____] hour onsite response to a service call on an
emergency basis.