Section 01330 SUBMITTAL PROCEDURES:
SD-02 Shop Drawings
Wet Chemical Fire Extinguishing System[; G][; G, [_____]]
Drawings consisting of system layout including assembly and
installation details and electrical connection diagrams; piping
layout showing pipe sizes, lengths, and supports. Drawings shall
has been coordinated and will function as intended and shall show
system relationship to items it protects and clearances required
for operation and maintenance. Drawings shall also include
conduit, cables, manual actuation stations and fusible links.
SD-03 Product Data
Similar Services
A statement of qualifications as specified.
Wet Chemical Fire Extinguishing System[; G][; G, [_____]]
following items. The data shall be highlighted to show model,
size, options, etc., that are intended for consideration and shall
be adequate to demonstrate compliance with contract requirements.
a.
Storage containers and mounting brackets
b. Fusible links, cables, conduit, corner pulleys, and link
mounting frames/brackets
c.
Release mechanisms
d.
Valves
e.
Discharge nozzles
f.
Piping components
g.
Remote manual actuation stations
h.
Fuel and power shutoff
i.
Alarms, alarm devices, alarm interface(s), control panels
Preliminary Tests[; G][; G, [_____]]
Proposed test procedures for preliminary test, at least 2 weeks
before the start of related testing. System diagrams that show
system layout and typed condensed normal and emergency operating
procedures, methods for checking the system for normal, safe
operation, and procedures for manual actuation shall be framed
under glass or laminated plastic. After approval, these items
shall be posted where directed.
Final Acceptance Tests[; G][; G, [_____]]
SECTION 13965A
Page 4