different days to accommodate both shifts of the Base Fire Department. Each
training session shall include emergency procedures, and unique maintenance
and safety requirements. Training areas will be provided by the Government
in the same building as the protected areas. The training conducted shall
period shall be coordinated through the Contracting Officer not less than
two weeks prior to the session.
3.11
SCHEDULE
Some metric measurements in this section are based on mathematical
conversion of inch-pound measurement, and not on metric measurement
commonly agreed to by the manufacturers or other parties. The inch-pound
and metric measurements shown are as follows:
Products
Inch-Pound
Metric
a.
Tank Capacity
= 10 gallons
= 38 liters
b.
Concentrate Fill Pump
Flow Rate
= 7 gpm
= 27 L/m
c.
Diaphragm Pressure
Proportioning Tanks
Working Pressure
= 175 psig
= 1206 kPa (gage)
-- End of Section --
SECTION 13956N
Page 43