3.5.3
Piping Labels
Provide permanent labels in foam rooms, spaced at 6 meters 20 foot maximum
intervals along pipe, indicating "WATER", "FOAM CONCENTRATE", and "FOAM
SOLUTION" on corresponding piping.
3.5.4
Field Touch-Up
Clean damaged areas of shop coated tanks in accordance with SSPC SP 11 and
coat cleaned areas with the same materials used for the shop applied
coating system.
3.6
ELECTRICAL WORK
**************************************************************************
NOTE: Edit Section 16402, "Interior Distribution
System" and include as part of the project
specification.
**************************************************************************
**************************************************************************
NOTE: When project includes requirement for a
building fire alarm system, include Section 13852 in
the project specification. When project requires
only tying into an existing building fire alarm
system, fire alarm wiring should be specified in
this section. Select the first 13852 Section title
when using the basic NAVFAC guide specification
covering the subject work or select the second title
when using the EFD regional guide specification
covering the subject work.
**************************************************************************
Electrical work is specified in Section 16402 INTERIOR DISTRIBUTION SYSTEM,
except for control [and fire alarm] wiring. [Fire alarm system is
specified in Section [13852N INTERIOR FIRE ALARM SYSTEM] ["Fire Alarm and
Fire Detecting Systems (Local)"]].
3.6.1
Wiring
Provide control wiring, and connections to fire alarm systems, under this
section in accordance with NFPA 70 and NFPA 72. Provide wiring in rigid
metal conduit or intermediate metal conduit, except electrical metallic
tubing may be used in dry locations not enclosed in concrete or where not
subject to mechanical damage. Do not run low voltage DC circuits in the
same conduit with AC circuits. [Run wiring to UV-IR detectors alone in
separate conduit if required by the detector manufacturer.]
3.7
FLUSHING
Flush the piping system with potable water in accordance with NFPA 13.
Continue flushing operation until water is clear, but for not less than 10
minutes.
3.8
FIELD QUALITY CONTROL
compliance with drawings, specifications, and manufacturer's submittals.
Perform tests in the presence of the Contracting Officer to determine