flow of water or AFFF. Alarm actuating device shall [have mechanical
diaphragm controlled retard device adjustable from 10 to 60 seconds and
shall] instantly recycle.
2.12.4
Trouble Alarm
**************************************************************************
NOTE: Delete if a building fire alarm system exists
in the building or is being provided under this
project.
**************************************************************************
**************************************************************************
supervision.
**************************************************************************
Provide local [100 mm4 inch] electric alarm [bell] [horn] [_____] to
indicate trouble [or failure of the [detection system] [or] [pre-action
sprinkler piping system]]. Also connect trouble alarm into the building
fire alarm control panel to indicate "trouble" on a separate zone labelled
"Foam System Trouble".
2.13
**************************************************************************
NOTE: Include for projects involving pre-action
**************************************************************************
Provide an approved automatic type electric motor driven air compressor
including pressure switch, air piping, and [38 liter] [10 gallon][_____]
minimum capacity tank. Compressor shall have a minimum capacity capable of
charging the complete sprinkler system to normal system air pressure within
30 minutes. Provide each system with an approved automatic air pressure
regulating device.
2.14
AFFF CONCENTRATE
**************************************************************************
NOTE: Consult the facility fire department and the
Division Fire Protection Engineer to determine
percentage.
**************************************************************************
2.14.1
Concentrate Fill Pump
Provide one pump to fill foam system tank. Pump shall have a minimum flow
rate of 27 L/m 7 gpm. Pump shall be complete with 115 VAC motor, fused
switch, power cord with plug and 3 meters 10 foot minimum suction and clear
discharge hoses.
2.15
DIAPHRAGM PRESSURE PROPORTIONING EQUIPMENT
**************************************************************************
NOTE: Select the method of proportioning best
suited for the project. For hangars, NFPA 409