submittals are already marked with a "G". Only
delete an existing "G" if the submittal item is not
complex and can be reviewed through the Contractor's
submittal is sufficiently important or complex in
context of the project.
For submittals requiring Government approval on Army
projects, a code of up to three characters within
the submittal tags may be used following the "G"
designation to indicate the approving authority.
Codes for Army projects using the Resident
Management System (RMS) are: "AE" for
Architect-Engineer; "DO" for District Office
(Engineering Division or other organization in the
District Office); "AO" for Area Office; "RO" for
Resident Office; and "PO" for Project Office. Codes
following the "G" typically are not used for Navy
projects.
Submittal items not designated with a "G" are
considered as being for information only for Army
projects and for Contractor Quality Control approval
for Navy projects.
**************************************************************************
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are [for Contractor Quality Control
approval.][for information only. When used, a designation following the
"G" designation identifies the office that will review the submittal for
the Government.] The following shall be submitted in accordance with
Section 01330 SUBMITTAL PROCEDURES:
SD-02 Shop Drawings
Professional Engineer or a NICET Level [3] [4] Fire Alarm
Technician, as specified.
SD-03 Product Data
Storage Batteries
Substantiating battery calculations for supervisory and alarm
component and each panel component, and the battery recharging
period shall be included.
Low Battery Voltage
Voltage drop calculations for notification appliance circuits to
indicate that sufficient voltage is available for proper appliance
operation.
Special Tools and Spare Parts
Spare parts data for each different item of material and
SECTION 13851A
Page 7