checking applicability.
**************************************************************************
The [elevated tank] [standpipe] [reservoir] shall be disinfected by the
Contractor in accordance with [AWWA C652] [_____]. After the chlorination
procedure is completed and before the storage facility is placed in
service, the Contracting Officer will collect samples of water in properly
sterilized containers for bacteriological testing from the full facility in
accordance with Section 7 of AWWA C652. The tank will not be accepted
until satisfactory bacteriological results have been obtained.[ After
coating system has been inspected, approved, and cured, rinse tank with
potable water. Disinfect tank and connecting lines in accordance with AWWA
C652, [Method 1] [Method 2] [or] [Method 3].]
3.9.2
Piping
The valves and piping shall be disinfected by the Contractor in accordance
with Section 02510A WATER DISTRIBUTION SYSTEM.
3.10
INSPECTION AND REPAIR
Prior to tank repair job, perform a detailed inspection of the structure
and submit report by a certified inspector.
-- End of Section --
SECTION 13209
Page 21