Immediately upon detection, abraded or corroded spots on shop-painted
surfaces shall be wire brushed and touched up with the same color and
material used for the shop coat. Section 09900 PAINTS AND COATINGS, for
painting of shop-primed ferrous surfaces exposed on the outside of the
building and all shop-primed surfaces of doors and windows.
3.4
FIELD QUALITY CONTROL
At the discretion of the Contracting Officer, sample panels may be taken at
random from each delivery or from stockpiles on the site at any time during
the construction period, and tests may be made to check the conformance of
the materials to the requirements specified in paragraph entitled "Factory
Color Finish." Failure of the sample sheets to pass the required tests
shall be cause for rejection of all sheets represented by the samples and
replacement of the entire shipment.
3.5
SPECIAL INSPECTION AND TESTING FOR SEISMIC-RESISTING SYSTEMS
**************************************************************************
NOTE: Include this paragraph only when special
inspection and testing for seismic-resisting systems
is required by paragraph 3.2 of FEMA 302, NEHRP
RECOMMENDED PROVISIONS FOR SEISMIC REGULATIONS FOR
NEW BUILDINGS AND OTHER STRUCTURES.
This paragraph will be applicable to both new
buildings designed according to TI 809-04, SEISMIC
DESIGN FOR BUILDINGS.
The designer must indicate on the drawings all
locations and all features for which special
inspection and testing is required in accordance
with Chapter 3 of FEMA 302. This includes
indicating the locations of all structural
components and connections requiring inspection.
Add any additional requirements as necessary.
**************************************************************************
Special inspections and testing for seismic-resisting systems and
components shall be done in accordance with Section 01452A SPECIAL
INSPECTION FOR SEISMIC RESISTING SYSTEMS.