considered as being for information only for Army
projects and for Contractor Quality Control approval
for Navy projects.
**************************************************************************
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are [for Contractor Quality Control
approval.][for information only. When used, a designation following the
"G" designation identifies the office that will review the submittal for
the Government.] The following shall be submitted in accordance with
Section 01330 SUBMITTAL PROCEDURES:
SD-02 Shop Drawings
Rectifier installation
Anode installation
Anode junction boxes
SD-03 Product Data
[
Rectifiers; G]
[
Impressed current anodes; G]
[
Galvanic anodes; G]
Permanent reference electrodes; G
Shunt resistors
Include certified test data for the impressed current anodes
stating the maximum recommended anode current output density and
the rate of gaseous production if any at that current density.
SD-07, Certificates
Qualifications of Corrosion Engineer; G
SD-10 Operation and Maintenance Data
Cathodic Protection System, Data Package 5; G
Submit in accordance with Section 01781 OPERATION AND
MAINTENANCE DATA.
SD-11 Closeout Submittals
Initial Cathodic Protection System Field Test Report; G
One Year Warranty Period Cathodic Protection System Field Test
Report; G
Final Cathodic Protection System Field Test Report; G