Include penetration details.
SD-03 Product Data
Telephone and signal line filters
Shielded air vents
Door assemblies
SD-06 Test Reports
**************************************************************************
NOTE: When specifying nonlatching doors, delete
door static load and sag tests and cycle test for
door latches. Retain cycle test for door hinges.
**************************************************************************
Door static load test
Door sag test
Swinging door closure test
EMI tests for line filters
Submit final report to Resident Officer in Charge of
Construction within 30 days following completion.
Seam leak detection testing
The results of EMI testing shall be submitted to the Contracting
Officer on a daily basis and test results incorporated into a EMI
Shielding Test Final Report. Submit final reports within 30 days
following completion of tests. List location of the permanent
SELDS test leads.
SD-07 Certificates
Performance test plan
Qualifications of installation supervision personnel
Qualifications of testing agency
Certification of test equipment
Components of shielded enclosure individually and as a system,
SD-10 Operation and Maintenance Data
Shielded enclosure, Data Package 3; G
SECTION 13093N
Page 8