3.2.3
Valances
Install with top edge parallel to ceiling.
3.3
DRAPERY SCHEDULE
**************************************************************************
NOTE: Some projects require several drapery
treatments. Where such variations exist, a drapery
schedule made a part of this section or should be
included in the drawings. The schedule and any
necessary detailed drawings should be
cross-referenced. Schedule and drawing data should
include all necessary information, such as: areas
and rooms to receive draperies; size and placement
of each; type and location of rods or tracks,
(ceiling-hung, stationary, center close two-way,
etc.); drapery length, (floor, sill, or apron);
whether lined or unlined; fabric type, color, and
pattern unless covered in paragraph entitled
"Fabrics."
**************************************************************************
-- End of Section --
SECTION 12491N
Page 13