1.4
QUALIFICATIONS
Procedures and welders shall be qualified in accordance with the code under
which the welding is specified to be accomplished.
1.5
DELIVERY AND STORAGE
All equipment delivered and placed in storage shall be stored with
protection from the weather, excessive humidity and excessive temperature
1.6
FIELD MEASUREMENTS
After becoming familiar with all details of the work, the Contractor shall
verify all dimensions in the field, and shall advise the Contracting
Officer of any discrepancy before performing the work.
1.7
GENERAL PROJECT REQUIREMENTS
1.7.1
Standard Products
Materials and equipment shall be the standard products of a manufacturer
regularly engaged in the manufacture of such products and shall essentially
duplicate items that have been in satisfactory use for at least 2 years
prior to bid opening. Equipment shall be supported by a service
organization that is, in the opinion of the Contracting Officer, reasonably
convenient to the site.
1.7.2
Nameplates
Each major item of equipment shall have the manufacturer's name, address,
type or style, model or serial number, and catalog number on a plate
secured to the item of equipment.
1.7.3
Special Tools
One set of special tools, calibration devices, and instruments required for
operation, calibration, and maintenance of the equipment shall be provided.
1.7.4
Spare Parts
The Contractor shall submit spare parts data for each different item of
material and equipment specified, after approval of the related submittals
and not later than [_____] months prior to the date of beneficial
occupancy. The data shall include a complete list of parts and supplies,
with current unit prices and source of supply.
PART 2
PRODUCTS
2.1
MATERIALS
Materials and equipment shall conform to the following respective
publications and other specified requirements.
2.1.1
Steel Shapes, Plates and Bars
Steel shapes, plates, and bars shall conform to ASTM A 36/A 36M.