Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are [for Contractor Quality Control
approval.][for information only. When used, a designation following the
"G" designation identifies the office that will review the submittal for
the Government.] The following shall be submitted in accordance with
Section 01330 SUBMITTAL PROCEDURES:
SD-02 Shop Drawings
wiring, schematic, and any other details required to demonstrate
that the system has been coordinated and will properly function as
a unit. Drawings shall show capacities and pressure drop; heat
and material balances; make and model; complete list of equipment
and materials. Drawings shall show proposed layout and anchorage
of equipment and appurtenances, and equipment relationship to
other parts of the work including clearances for installation,
maintenance and operation.
SD-03 Product Data
Emissions
Reports for permit compliance.
Temperature Sensors, Transmitters and Controllers[; G][; G, [_____]
]
Detailed manufacturer's data on the overall controls, sensors,
process controllers, control operators, ladder diagrams, timers,
sequence of controls, valves, alarms, signals, interlocks and cut
off systems. Data describing in detail the equipment used to
monitor emissions, including the sampling probe, filters, off-gas
transport tubing, sampling pump, moisture removal system, analyzer
Thermal Oxidation System[; G][; G, [_____]]
Manufacturer's descriptive data and technical literature,
Field Training
Training course curriculum and training instructions, [14]
[_____] days prior to the start of training.
SD-06 Test Reports
Printout of factory test results.
Field Quality Control/Tests[; G][; G, [_____]]
Test reports, in booklet form, showing all field tests performed
to adjust each component and all field tests performed to prove