2.14.11
Plant Anchorage
Materials necessary for anchorage of the plant to the concrete support slab
shall be as recommended by the manufacturer of the plant.
2.15
UTILITIES SERVICE CONNECTIONS
2.15.1
Water Service
**************************************************************************
NOTE: Hypochlorinator should be specified for all
plants 4.38 L/s 100,000 GPD capacity and below.
Chlorinator should be specified for all plants 6.57
L/s 150,000 GPD capacity and above. Between 4.38
and 6.57 L/s 100,000 and 150,000 GPD capacity either
is suitable. Selection should be made on basis of
existing station or base practices, local
availability, and comparative costs.
**************************************************************************
**************************************************************************
NOTE: Specify in the appropriate section of project
specification the nearest point of connection to the
plant, and also type of connection available.
**************************************************************************
**************************************************************************
NOTE: Delete reference either to chlorinator or to
hypochlorinator.
**************************************************************************
**************************************************************************
NOTE: Delete reference to "Frost-proof" for plants
in areas where freezing temperatures are not
encountered.
**************************************************************************
**************************************************************************
NOTE: Delete reference either to chlorinator or to
hypochlorinator.
**************************************************************************
Water line shall be a 25 mm one inch copper water line extending from a
point not less than 1.52 m 5 feet from the treatment plant to the
[hypochlorinator housing] [chlorinator]. A 25 mm one inch valve in a
[frost-proof] valve box shall be provided below grade. A 19 mm 3/4 inch
hose bibb shall be provided in the [hypochlorinator] [chlorinator] housing.
2.15.2
Electrical Service
An electric service line shall be provided from a point not less than 1.52 m
5 feet from the treatment plant to the electrical control system enclosure.
2.16
CATHODIC PROTECTION
**************************************************************************
NOTE: Delete the paragraph when concrete plant only
is specified. This specification is structured for
steel plant only, concrete plant only, or steel or
SECTION 11375N