of supports necessary for the installation of the equipment.
2.15.2
Installation Within a Pipeline
**************************************************************************
NOTE: Delete this paragraph when comminutor is to
be installed in a channel.
**************************************************************************
Comminutor shall have standard flanged or bell and spigot connections for
installation in pipeline.
PART 3
EXECUTION
3.1
INSTALLATION
All materials and equipment shall be installed as shown and in accordance
with the approved written recommendations of the equipment manufacturer.
3.2
ELECTRICAL WORK
Electrical equipment and wiring shall be in accordance with Section 16402
INTERIOR DISTRIBUTION SYSTEM. Electrical characteristics shall be as
indicated. Manual or automatic control and protective or signal devices
required for the operation specified, and any control wiring required for
under this section of the specification.
3.3
PAINTING
Equipment shall be thoroughly cleaned, primed, and given two finish coats
of paint at the factory in accordance with the recommendations of the
manufacturer. Field painting shall be as specified in Section 09900
PAINTING, GENERAL.
3.4
TRAINING
**************************************************************************
NOTE: Consult equipment manufacturers for
recommended time required to train personnel for the
proper operation of the unit and insert number of
hours.
**************************************************************************
A field training course shall be provided for operating and supervising
staff members. Training shall be provided for a total period of [_____]
hours of normal working time and shall start after the system is
functionally complete but prior to final acceptance tests. The field
instructions shall cover all of the items contained in the operating and
maintenance instructions.
3.5
SPECIAL TOOLS
Special tools shall be furnished for the proper operation and maintenance
of equipment, and shall be installed in a wall-mounted hardwood or metal
container. The Contractor shall furnish a complete set of manufacturer's
recommended spare parts including cutting teeth and combs or other cutting
elements, fasteners, screens, seals or bearings, etc.
SECTION 11331
Page 11