contaminants. The remaining samples shall not exceed [[_____] mg/L for
grease and oil] [[_____] mg/L for petroleum hydrocarbon] contaminants. If
the separator does not meet requirements of this specification, due to poor
workmanship and wrong fabrication dimensions, the unit may be rejected. If
the unit is not operating at design efficiency 5 days after installation,
Government may reject system. In the event Government rejects unit,
Contractor shall remove separator or defective components and replace with
acceptable unit or components and test as specified above.
-- End of Section --