PART 3
EXECUTION
3.1
INSTALLATION
**************************************************************************
NOTE: Toilet partitions in barracks, and other hard
usage areas, as well as those partitions on which
grab bars are to be mounted, will be bolted to
walls. Through-bolting will be specified for these
applications; except, toggle bolts may be specified
when through-bolting would be exposed in a finished
room or would otherwise be unsuitable.
**************************************************************************
Toilet partitions shall be installed straight and plumb with uniform
clearance of 13 mm 1/2 inch between pilasters and panels; 25 mm 1 inch
between pilasters and walls; and not more than 5 mm 3/16 inch between
pilasters and doors, in accordance with approved manufacturer's
instructions with horizontal lines level and rigidly anchored to the
supporting construction. Where indicated, anchorage to walls shall be by
[through-bolting] [toggle-bolting]. Drilling and cutting for installation
of anchors shall be at locations that will be concealed in the finished
work. In the finished work, conceal evidence of drilling in floors and
walls. Screws and bolts shall be stainless steel.
3.2
ADJUSTING AND CLEANING
Doors shall have a uniform vertical edge clearance of approximately 5 mm
3/16 inch and shall rest open at approximately 30 degrees when unlatched.
Baked enamel finish shall be touched up with the same color of paint that
was used for the finish. Toilet partitions shall be cleaned in accordance
with approved manufacturer's instructions and shall be protected from
damage until accepted.
-- End of Section --
SECTION 10153
Page 8