3.11
SURFACES TO BE PREPARED FOR PAINTING
Surfaces shall be prepared as specified and as shown in the painting
schedule [in Section 09900 PAINTS AND COATINGS] [on the drawings].
3.12
CLEANING
Cloths, cotton waste and other debris that might constitute a fire hazard
shall be placed in closed metal containers and removed at the end of each
day. Containers shall be removed from the site or destroyed in an approved
manner. Preparation materials and other deposits on adjacent surfaces
shall be removed and the entire job left clean and ready for painting.
-- End of Section --
SECTION 09995
Page 13