Codes for Army projects using the Resident
Management System (RMS) are: "AE" for
Architect-Engineer; "DO" for District Office
(Engineering Division or other organization in the
District Office); "AO" for Area Office; "RO" for
Resident Office; and "PO" for Project Office. Codes
following the "G" typically are not used for Navy
projects.
Submittal items not designated with a "G" are
considered as being for information only for Army
projects and for Contractor Quality Control approval
for Navy projects.
**************************************************************************
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are [for Contractor Quality Control
approval.][for information only. When used, a designation following the
"G" designation identifies the office that will review the submittal for
the Government.] The following shall be submitted in accordance with
Section 01330 SUBMITTAL PROCEDURES:
SD-05, Design Data
Use of Door Sheet Access Way; G, [_____]
SD-06 Test Reports
Coating Sample Test Reports; G, [_____]
Abrasive Sample Test Reports; G, [_____]
Daily Inspection Reports; G, [_____]
Recycled Metallic Abrasive Field Test Reports (Daily and Weekly);
G, [_____]
SD-07 Certificates
Work Plan; G, [_____]
Qualifications of Certified Industrial Hygienist (CIH); G, [_____]
Qualifications of Testing Laboratory for Coatings; G, [_____]
Qualifications of Testing Laboratory for Abrasive; G, [_____]
Qualifications of Coating Contractors; G, [_____]
[
Qualifications of Coating Manufacturer's Representative; G, [_____]
]
Roof Joint Sealant Materials; G, [_____]
Roof Joint Sealant Compatibility; G, [_____]
Epoxy Coating Materials; G, [_____]
SECTION 09970
Page 10