resinous flooring shall be included.
SD-04 Samples
Flooring Systems[; G][; G, [_____]]
Cured samples of each floor finish or color combination.
SD-06 Test Reports
Testing[; G][; G, [_____]]
Reports of tests for conductive sparkproof flooring, including
analysis and interpretation of test results. Each report shall be
properly identified. The test methods used shall be identified
and the test results shall be recorded.
SD-07 Certificates
Qualifications of Installer[; G][; G, [_____]]
A written statement from the floor manufacturer that the
installer is acceptable.
SD-08 Manufacturer's Instructions
Application[; G][; G, [_____]]
Complete instructions for application of flooring system
including any precautions or special handling instructions
required to comply with OSHA 29 CFR 1910-SUBPART Z.
SD-10 Operation and Maintenance Data
Flooring Systems[; G][; G, [_____]]
Data Package 1 in accordance with Section 01781 OPERATION AND
MAINTENANCE DATA.
1.3
DELIVERY AND STORAGE
Deliver the materials to the project site in unopened bags and containers
clearly labeled with the name of the manufacturer, type of material, batch
number, and date of manufacture. Store materials, other than aggregates,
away from fire, sparks, or smoking areas. Maintain the storage area
between 10 and 32 degrees C 50 and 90 degrees F.
1.4
ENVIRONMENTAL CONDITIONS
Maintain the ambient room and floor temperatures at 18 degrees C 65 degrees
F, or above, for a period extending from 48 hours before installation until
one week after installation. Concrete to receive surfacing shall have
cured for at least 28 days and shall have been free of water for at least 7
days. Wood substrates shall have a measured moisture content of between 8
and 10 percent prior to application.