AAMA 101. The completed window installation shall be watertight in
accordance with Section 07920 JOINT SEALANTS. Glass and glazing shall be
installed in accordance with requirements of this section and Section 08800
GLAZING.
3.2
ADJUSTMENTS AND CLEANING
3.2.1
Hardware Adjustments
Final operating adjustments shall be made after glazing work is complete.
Operating sash or ventilators shall operate smoothly and shall be
weathertight when in locked position.
3.2.2
Cleaning
Aluminum window finish and glass shall be cleaned on exterior and interior
sides in accordance with window manufacturer's recommendations. Alkaline
or abrasive agents shall not be used. Precautions shall be taken to avoid
scratching or marring window finish and glass surfaces.
-- End of Section --
SECTION 08520A
Page 19