fireproofing material has been completed and before sprayed material is
covered. Any locations missing fireproofing shall be patched in accordance
with the manufacturer's requirements.
3.5.4
Manufacturer's Inspection
**************************************************************************
NOTE: Delete requirement for manufacturer's
inspection for small jobs and remote sites where
such support is not economical.
**************************************************************************
The manufacturer shall inspect the fireproofing work after the work is
completed on each floor or area, including testing, repair and clean-up,
and shall certify that the work complies with the manufacturer's criteria
and recommendations. Before the sprayed material is covered, and after all
of the fireproofing work is completed, including repair, testing, and
clean-up; and after mechanical, electrical and other work in contact with
fireproofing material has been completed, the manufacturer shall re-inspect
the work and certify that the entire project complies with the
manufacturer's criteria and recommendations. The Contractor shall obtain
and submit the Manufacturer's Inspection Report and certifications of
approval.
3.5.5
Patching
Patching and repairing of damaged fireproofing is the responsibility of the
Contractor. The patching material shall be the same as that specified for
that area.
3.6
CLEANUP
Surfaces not indicated to receive fireproofing shall be thoroughly cleaned
of sprayed material within a 24 hour period after application.
-- End of Section --