following the "G" typically are not used for Navy
projects.
Submittal items not designated with a "G" are
considered as being for information only for Army
projects and for Contractor Quality Control approval
for Navy projects.
**************************************************************************
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are [for Contractor Quality Control
approval.][for information only. When used, a designation following the
"G" designation identifies the office that will review the submittal for
the Government.] The following shall be submitted in accordance with
Section 01330 SUBMITTAL PROCEDURES:
SD-02 Shop Drawings
Roof plan drawing depicting wind loads and boundaries of
enhanced perimeter and corner attachments of roof system
components, [,location of perimeter half-sheets][, spacing of
perimeter, corner, and infield fasteners,] as applicable. The
drawing shall reflect the project roof plan of each roof level and
conditions indicated.; G, [_____]
SD-03 Product Data
**************************************************************************
NOTE: Edit the product data submission requirements
as necessary for the system specified. Include
bracketed requirements as applicable to the system
being specified.
**************************************************************************
EPDM Sheet; G, [_____]
Seam Tape
Lap Splice Adhesive
Water Cutoff Mastic/Water Block
Lap Cleaner, Lap Sealant, and Edge Treatment
Flashing
Flashing Accessories
Flashing Tape
Fasteners and Plates
[
Roof Insulation
[
Protection Mat]
SECTION 07530
Page 7