**************************************************************************
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are [for Contractor Quality Control
approval.][for information only. When used, a designation following the
"G" designation identifies the office that will review the submittal for
the Government.] The following shall be submitted in accordance with
Section 01330 SUBMITTAL PROCEDURES:
SD-03 Product Data
Shingles
Submit data including type, weight, class, UL labels, and
special types of underlayment and eave flashing.
[
SD-04 Samples
**************************************************************************
NOTE: Select color according to local practice,
except use light-reflective colors for air
conditioned buildings. Where color is specified in
paragraph entitled "Asphalt Shingles," delete the
requirement for submittal of color charts.
**************************************************************************
Shingles; G, [_____]
Full shingle sample and manufacturer's standard size samples of
materials and products requiring color or finish selection.
[
Color charts; G, [_____]]
]
SD-08 Manufacturer's Instructions
Application
1.4
DELIVERY AND STORAGE
Deliver materials in the manufacturer's unopened bundles and containers
bearing the manufacturer's brand name. Keep materials dry, completely
covered, and protected from the weather. Store according to manufacturer's
written instructions. Roll goods shall be stored on end in an upright
position or in accordance with manufacturer's recommendations. Immediately
before laying, roofing felt shall be stored for 24 hours in an area
maintained at a temperature not lower than 10 degrees C. 50 degrees F.
1.5
WARRANTIES
**************************************************************************
NOTE: The warranty clauses in this guide
specification have been approved by the Government.
The paragraphs may be used without any request for
waiver.
**************************************************************************
Warranties shall begin on the date of Government acceptance of the work.
SECTION 07311
Page 6