PART 2
PRODUCTS
2.1
JOISTS[, JOIST GIRDERS,] AND ACCESSORIES
**************************************************************************
NOTE: When extra stiffness is desired, for comfort
or special material support, specify the allowable
deflection for that span.
**************************************************************************
SJI Specs & Tables for the joist [and joist girders] series indicated.
2.2
PAINTING
2.2.1
Shop Painting
**************************************************************************
NOTE: Omit bracketed text when field painting is
not required.
**************************************************************************
Clean and prime joists in accordance with SSPC PS 14.01, Steel Joist Shop
Painting System, using only Type I, "Red Oxide Paint." [Finish coat of
paint is specified in Section 09900 PAINTS AND COATINGS.]
PART 3
EXECUTION
3.1
INSTALLATION
3.1.1
Handling and Erection
SJI Specs & Tables for the joist [and joist girder] series indicated.
3.1.2
Welding
AWS D1.1/D1.1M.
3.2
PAINTING
3.2.1
Touch-Up Painting
After erection of joists [and joist girders], touch-up connections and
areas of abraded shop coat with paint of the same type used for the shop
coat.
[3.2.2
Field Painting
**************************************************************************
NOTE: Omit bracketed text when field painting is
not required.
**************************************************************************
Paint joists [and joist girders] requiring a finish coat in conformance
with the requirements of Section 09900 PAINTS AND COATINGS.