considered as being for information only for Army
projects and for Contractor Quality Control approval
for Navy projects.
**************************************************************************
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are [for Contractor Quality Control
approval.][for information only. When used, a designation following the
"G" designation identifies the office that will review the submittal for
the Government.] The following shall be submitted in accordance with
Section 01330 SUBMITTAL PROCEDURES:
SD-02 Shop Drawings
Steel joist structure; G
SD-06 Test Reports
Erection inspection
Welding inspections
SD-07 Certificates
Accessories
Welder qualification
1.3
REGULATORY REQUIREMENT
All joists 12192 mm 40 feet and over shall have a row of bolted bridging in
place before slackening of hoisting lines. Secure all joist bridging and
anchoring in place prior to the application of any construction loads.
Distribute temporary loads so that joist capacity is not exceeded. Do not
apply loads to bridging.
1.4
DELIVERY AND STORAGE
Handle, transport, and store joists [and joist girders] in a manner to
prevent damage affecting their structural integrity. Store all items off
the ground in a well drained location protected from the weather and easily
accessible for inspection and handling.
1.5
QUALITY ASSURANCE
1.5.1
Drawing Requirements
Submit steel joist structure drawings. Show joist type and size, layout in
plan, and erection details including methods of anchoring, framing at
openings, type and spacing of bridging, [requirements for field welding,]
and details of accessories as applicable.
1.5.2
Certifications: Requirements
Prior to welding, submit certification for welder qualification, welding
operation, and tacker, stating the type of welding and positions qualified
for, the code and procedure qualified under, date qualified, and the firm
and individual certifying the qualification tests.