Details of the contraction joint material and installation
procedures will be submitted within [_____] days after the Notice
to Proceed.
[Gallery
Details of the Contractor's construction methods shall be
submitted within [_____] days after the Notice to Proceed.]
Vertical Facings for RCC Construction[; G][; G, [_____]]
Details of the Contractors construction methods and equipment
shall be submitted for review within [_____] days after Notice to
Proceed.
1.6
REGULATORY REQUIREMENTS
**************************************************************************
NOTE: Issue (date) of regulatory requirements
current than stated.
**************************************************************************
The regulatory requirements listed below form a part of this specification
to the extent referenced. The regulatory requirements are referred to in
the text by basic designation only.
EM 385-1-1
(October 1992) Safety and Health Requirements
Manual
1.7
MATERIAL DELIVERY, STORAGE, AND HANDLING
1.7.1
Cementitious Materials
1.7.1.1
Transportation
When bulk cement or pozzolan is not unloaded from primary carriers directly
into weather-tight hoppers at the batching plant, transportation from the
railhead, mill, or intermediate storage to the batching plant shall be
accomplished in adequately designed weather-tight trucks, conveyors, or
other means that will protect the material from exposure to moisture.
1.7.1.2
Storage
Cementitious materials shall be furnished in bulk. Immediately upon
receipt at the site of the work, all cementitious materials shall be stored
in a dry, weather-tight, and properly ventilated structure. All storage
facilities shall permit easy access for inspection and identification.
Sufficient materials shall be in storage for at least two operating days of
continuous placement. In order that cement may not become unduly aged
after delivery, the Contractor shall use any cement that has been stored at
the site for 60 days or more before using cement of lesser age.
1.7.2
Aggregate Storage
**************************************************************************
NOTE: Consult the materials engineer to select the
appropriate optional phrase and to fill in the blank.
SECTION 03701
Page 22