Mixers[; G][; G, [_____]].
The make, type, capacity, and number of the concrete mixers
proposed for use shall be submitted [[_____] days prior to
installation] [not later than 30 days after Notice to Proceed] for
review by the Contracting Officer.
Equipment[; G][; G, [_____]]
Transporting and Conveying Equipment[; G][; G, [_____]]
Spreading and Remixing Equipment[; G][; G, [_____]]
Compaction Equipment[; G][; G, [_____]].
A listing of the equipment proposed for transporting, handling,
depositing, spreading, and compacting the concrete shall be
submitted for review by the Contracting Officer [[_____] days
before concrete placement begins.] [not later than 30 days after
Notice to Proceed.] The data submitted shall include site
drawings or sketches with locations of equipment and placement
site.
Aggregate Production Schedule[; G][; G, [_____]]
Descriptions and details for all methods and operations proposed
for aggregate and concrete operations including daily and weekly
production rates, shall be submitted [not later than [_____] days
after Notice to Proceed] for review and approval for conformance
with specifications.
Regular Lift-Joint Treatment[; G][; G, [_____]]
The method and equipment proposed for joint cleanup and waste
disposal shall be submitted for review by the Contracting Officer
[[_____] days before concrete placement begins] [not later than
[_____] days after Notice to Proceed] for conformance with
specifications.
Curing and Protection[; G][; G, [_____]].
The curing media and methods to be used shall be submitted for
review to the Contracting Officer [[_____] days before concrete
placement begins] for conformance with specifications.
Cold-Weather Protection[; G][; G, [_____]]
When concrete is to be placed under cold-weather conditions, a
description of the materials and methods proposed for protection
of the concrete shall be furnished to the Contracting Officer for
review [_____] days in advance of anticipated need date.
Hot-Weather Protection[; G][; G, [_____]]
When concrete is to be placed under hot-weather conditions, a
description of the materials and methods proposed for protection
of the concrete shall be furnished to the Contracting Officer for
review [_____] days in advance of anticipated need date.
Contraction Joints