1.2.1
Waterstops
1.2.1.1
Payment
Payment will be made for costs associated with waterstops, including labor,
materials and use of all equipments and tools required to complete the
waterstop work. No separate payment will be made for expansion and
contraction joints which are included in the costs for the items to which
work for expansion and contraction joints are incidental.
1.2.1.2
Measurement
Waterstops will be measured for payment by the linear meter foot in place.
In computing the quantity of the waterstops, no allowance will be made for
laps. No separate measurement will be made for expansion and contraction
joints which are included in the costs for the items to which work for
expansion and contraction joints are incidental.
1.2.1.3
Unit of Measure
Unit of measure: linear meter foot.
1.3
SUBMITTALS
**************************************************************************
NOTE: Submittals must be limited to those necessary
for adequate quality control. The importance of an
item in the project should be one of the primary
factors in determining if a submittal for the item
should be required.
A "G" following a submittal item indicates that the
submittal requires Government approval. Some
submittals are already marked with a "G". Only
delete an existing "G" if the submittal item is not
complex and can be reviewed through the Contractor's
submittal is sufficiently important or complex in
context of the project.
For submittals requiring Government approval on Army
projects, a code of up to three characters within
the submittal tags may be used following the "G"
designation to indicate the approving authority.
Codes for Army projects using the Resident
Management System (RMS) are: "AE" for
Architect-Engineer; "DO" for District Office
(Engineering Division or other organization in the
District Office); "AO" for Area Office; "RO" for
Resident Office; and "PO" for Project Office. Codes
following the "G" typically are not used for Navy
projects.
Submittal items not designated with a "G" are
considered as being for information only for Army
projects and for Contractor Quality Control approval
for Navy projects.