**************************************************************************
2.1.1
Granular Fertilizer
[Organic][synthetic], granular controlled release fertilizer containing the
[_____] percent available phosphorus
[_____] percent available potassium
[_____] percent sulfur
[[_____] percent iron]
2.2
WATER
**************************************************************************
NOTE: When water is Government furnished, locate
the source. Recycled or reclaimed irrigation water
may be available through a tertiary treatment plant
on or off site. It is preferred that this type of
water be used for irrigation whenever possible.
Check project specific conditions.
Unless otherwise directed, water shall be the
responsibility of the Contractor. Water source
shall be potable or non-potable. If non-potable
edit specification accordingly. Source of water
shall be approved by the Contracting Officer and
shall be of suitable quality for irrigation,
containing no elements toxic to plant life.
Coordinate information presented here with Section
01500, "Temporary Facilities and Controls."
**************************************************************************
Source of water shall be approved by the Contracting Officer, and be of
suitable quality for irrigation.
2.3
MULCHES TOPDRESSING
**************************************************************************
NOTE: Check with the local Agriculture County
Extension Service Office for recommended and locally
available mulch material. Specify only one type of
mulch for the project.
**************************************************************************
Free from noxious weeds, mold, or other deleterious materials.
2.3.1
Inert Mulch Materials
[Riverbank stone] [crushed pit-run rock] [granite chips] [marble chips]
[crushed bricks] [volcanic rock] [_____] ranging in size from [_____] to
[_____] mm inches.
2.3.2
Organic Mulch Materials
**************************************************************************
NOTE: For projects at Camp Lejeune and New River,
SECTION 02935
Page 7