2.5.1
Granular Fertilizer
[Organic][synthetic], granular controlled release fertilizer containing the
[_____] percent available phosphorus
[_____] percent available potassium
[_____] percent sulfur
[[_____] percent iron]
2.6
WATER
**************************************************************************
NOTE: When water is Government furnished, locate
the source. Recycled or reclaimed irrigation water
may be available through a tertiary treatment plant
on or off site. It is preferred that this type of
water be used for irrigation whenever possible.
Check project specific conditions.
Unless otherwise directed, water shall be the
responsibility of the Contractor. Water source
shall be potable or non-potable. If non-potable
edit specification accordingly. Source of water
shall be approved by the Contracting Officer and
shall be of suitable quality for irrigation,
containing no elements toxic to plant life.
Coordinate information presented here with Section
01500, "Temporary Facilities and Controls."
**************************************************************************
Source of water shall be approved by Contracting Officer and of suitable
quality for irrigation containing no element toxic to plant life.
PART 3
EXECUTION
3.1
PREPARATION
3.1.1
EXTENT OF WORK
Provide soil preparation (including soil conditioners), fertilizing, and
sodding of all newly graded finished earth surfaces, unless indicated
otherwise, and at all areas inside or outside the limits of construction
that are disturbed by the Contractor's operations.
3.1.2
Soil Preparation
**************************************************************************
NOTE: Elevation of subgrade will vary depending
upon the needs for additional topsoil, sod, or other
treatment.
**************************************************************************
Provide 102 mm4 inches of [off-site topsoil][on-site topsoil] to meet
indicated finish grade. After areas have been brought to indicated finish
grade, incorporate [fertilizer] [pH adjusters] [soil conditioners] into
soil a minimum depth of [100] [_____] mm [4] [_____] inches by disking,
SECTION 02922
Page 11