3.7.2
The Contractor shall ensure that all remaining holes from the removal site
have been backfilled with [on-site soil] [__], tamped to [90 percent] [__]
compaction, leveled and finished to meet existing grade after settling.
Adjacent trees, shrubs, vines and groundcover destroyed by transplanting or
construction operations shall be replaced in kind in relation to size and
species and shall be installed in accordance with Section 02930 EXTERIOR
PLANTS. Turf shall be replaced with sod, and shall be installed in
accordance with Section 02922 SODDING.
3.7.3
Clean Up
**************************************************************************
NOTE: While recycling programs are optional for
government contractors the specifier should
encourage the practice if the cost to the Government
is reasonable. Information regarding location of
recycling facilities is available from the local
city or county waste management division.
**************************************************************************
Excess and waste material shall be removed from both removal site and the
installed site and shall be disposed offsite at an approved landfill or
recycling center. Adjacent paved areas shall be cleared.
3.8
PLANT ESTABLISHMENT PERIOD
The establishment period for transplanted materials shall be the same as
for newly planted exterior plants and shall conform to the same
requirements thereof as found in Section 02935 LANDSCAPE ESTABLISHMENT,
paragraph titled "Exterior Plant Establishment Period."
-- End of Section --
SECTION 02915
Page 19