on centers for full 6.28 rad360 degrees, rivet from inside of shelter.
3.8.2
Roof
Provide manufacturer's standard roof system including facia [gutter]
assembly, ensuring a weather-tight seal and installation.
3.9
When the installation has been completed, the Contractor shall clean up and
protect the site. Existing areas that have been damaged from the
installation operation shall be restored to original condition at
Contractor's expense.
3.9.1
Clean Up
The site shall be cleaned of all materials associated with the
installation. Site furnishing surfaces shall be cleaned of dirt, stains,
filings, and other blemishes occurring from shipment and installation.
instructions or as indicated.
3.9.2
Protection
The area shall be protected as required or directed by providing barricades
and signage. Signage shall be in accordance with Section 10430 EXTERIOR
SIGNAGE.
3.9.3
Disposal of Materials
Excess and waste material shall be removed and disposed off Government
property [_____].
3.10
RE-INSTALLATION
Where re-installation is required, the following shall be accomplished:
a.
Re-install the product as specified. Material acquisition of
replacement parts is the responsibility of the Contractor.
Provide replacement materials that are new and supplied by the
original manufacturer to match.
b.
Damage caused by the failed installation shall be repaired.
-- End of Section --
SECTION 02870
Page 31