designation to indicate the approving authority.
Codes for Army projects using the Resident
Management System (RMS) are: "AE" for
Architect-Engineer; "DO" for District Office
(Engineering Division or other organization in the
District Office); "AO" for Area Office; "RO" for
Resident Office; and "PO" for Project Office. Codes
following the "G" typically are not used for Navy
projects.
Submittal items not designated with a "G" are
considered as being for information only for Army
projects and for Contractor Quality Control approval
for Navy projects.
**************************************************************************
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are [for Contractor Quality Control
approval.][for information only. When used, a designation following the
"G" designation identifies the office that will review the submittal for
the Government.] The following shall be submitted in accordance with
Section 01330 SUBMITTAL PROCEDURES:
SD-02 Shop Drawings
Liner system
SD-03 Product Data
Liner
Seaming adhesive
Penetration assemblies
Filter fabric
SD-07 Certificates
Liner
Filter fabric
SD-08 Manufacturer's Instructions
Liner
Seaming adhesive
1.3
DELIVERY AND STORAGE
Deliver liner [and filter fabric] to site in largest sizes possible to
minimize field seaming. Protect from sunlight and other ultraviolet light
sources during storage. Keep cements and adhesives from extreme cold or
heat. Keep materials clean and dry.
SECTION 02661
Page 5