corrected to comply with the tolerances and the Contractor shall bear any
cost of correction. Method of correction shall be approved by the
Contracting Officer.
3.2.2
Shall not be less than design dimensions.
3.2.3
Top Location of Caissons
**************************************************************************
NOTE: Offset of less than 76 mm 3 inchesmay be
required if the eccentric loading is critical to the
column structure.
**************************************************************************
Install with top location deviating not more than [76] [_____] mm [3]
[_____] inches from centerline locations.
3.2.4
Vertical Caissons
Install plumb within a maximum of 38 mm 1 1/2 inches for the first 3 m 10
feet and 12.7 mm 1/2 inch for each 3 m 10 feet of additional depth.
3.2.5
Batter Caissons
**************************************************************************
NOTE: Consult the project structural engineer if
lesser inclination tolerance is required.
**************************************************************************
Install not more than [2] [_____] percent from specified inclination.
3.2.6
The Center of the Caisson
Shall be established after construction is completed and the center marked
by a suitable permanent mark.
3.3
TESTS
3.3.1
Penetration Tests
**************************************************************************
NOTE: The requirement for performing penetration
tests would be based on the availability of current
information on bearing conditions at caisson
locations. At least one caisson location should
require a penetration test in each area of
substantially different subsoil conditions.
**************************************************************************
3.3.1.1
Caisson Tests
After excavation, make penetration tests in accordance with ASTM D 1586 in
the bottoms of the caissons, in locations indicated, to determine bearing
conditions.
SECTION 02468N
Page 11