SD-06 Test Reports
Load Tests
Penetration Tests
Test Results.
SD-07 Certificates
Caissons
A certified copy of the survey. Lines and levels shall be
established and caisson centerline locations staked and maintained
by a registered surveyor or engineer provided by the Contractor.
Qualifications[; G][; G, [_____]]
Qualifications of the foundation system Contractor shall show
that he has been engaged in the successful installation of drilled
foundation caissons for at least [_____] years.
1.5
QUALIFICATIONS
1.5.1
Specialty Subcontractor
**************************************************************************
NOTE: Select applicable paragraph for agency
requirements. Basically, from 3 to 5 years should
be required for second paragraph.
**************************************************************************
The work shall be performed by a specialty subcontractor, specializing in
the specified foundation system and having experience installing the
specified foundation system under similar subsurface conditions.
1.5.2
Welding
Detail and field welding shall be in accordance with AWS D1.1/D1.1M.
Qualification of welding procedures, welders, and welding operators shall
be in accordance with AWS D1.1/D1.1M, Section 5. Records of test results
of welding procedures not prequalified and copies of records for each
qualified welding operator, containing records on positions of welding and
types of electrode qualifications, shall be kept by the Contractor and be
available for examination by the Contracting Officer.
1.6
PROJECT/SITE CONDITIONS
1.6.1
Subsurface Data
**************************************************************************
NOTE: Include location of available samples.
**************************************************************************
Subsurface soil data logs are shown on the drawings. The subsurface
investigation report and samples of materials, as taken from subsurface
investigations, are available for examination at [_____].