1.3.2
Full Compensation
Payment in accordance with the above paragraph, Unit Price, shall
constitute full compensation for furnishing, delivering, handling, and
installing (as applicable) all material, labor, and equipment necessary to
meet contract requirements applicable to the foundation piles. The
Contractor will not be allowed payment for withdrawn, broken, or rejected
piles or (except for control test piles) for a portion of any pile
remaining above the cut-off point.
1.3.3
Load Test
The Contractor will be paid for [_____] [_____] -kN -ton pile load tests.
The Contracting Officer reserves the right to increase or decrease the
number of load tests. Adjustments in the contract price shall be made [in
accordance with the CONTRACT CLAUSES] [for such increases or decreases by
the amounts bid for "Additional Pile Load Tests" or "Omitted Pile Load
Test"].
1.3.4
Pile Withdrawals
The Contractor will be paid for [_____] pile withdrawals. The Contracting
Officer reserves the right to increase or decrease the number of
withdrawals. Adjustments in the contract price shall be made [in
accordance with the CONTRACT CLAUSES] [for such increases or decreases by
the amounts bid for "Additional Pile Withdrawal" or "Omitted Pile
Withdrawal"].
1.3.5
Splices
The Contractor will be paid for work required to make each authorized pile
splice at the applicable contract price for "Steel H-Pile Splices."
1.4
SUBMITTALS
**************************************************************************
NOTE: Submittals must be limited to those necessary
for adequate quality control. The importance of an
item in the project should be one of the primary
factors in determining if a submittal for the item
should be required.
A "G" following a submittal item indicates that the
submittal requires Government approval. Some
submittals are already marked with a "G". Only
delete an existing "G" if the submittal item is not
complex and can be reviewed through the Contractor's
submittal is sufficiently important or complex in
context of the project.
For submittals requiring Government approval on Army
projects, a code of up to three characters within
the submittal tags may be used following the "G"
designation to indicate the approving authority.
Codes for Army projects using the Resident
Management System (RMS) are: "AE" for
Architect-Engineer; "DO" for District Office
(Engineering Division or other organization in the
SECTION 02456A
Page 6