PILE DRIVING LOG
CONTRACT NO.________________________ CONTRACT NAME_______________________
CONTRACTOR_____________________________ TYPE OF PILE_____________________
PILE LOCATION_____________ PILE SIZE: BUTT/TIP: ________ LENGTH_________
GROUND ELEVATION_________________________ CUT OFF ELEVATION______________
PILE TIP ELEVATION_________________ VERTICAL (_____) BATTER 1 ON (_____)
SPLICES ELEVATION____________________ COMPANY____________________________
HAMMER:
MAKE & MODEL_________________ WT. RAM______________________
STROKE______________________ RAM RATED ENERGY____________________________
DESCRIPTION & DIMENSIONS OF DRIVING CAP___________________________________
CUSHION MATERIALS & THICKNESS_____________________________________________
INSPECTOR_________________________________________________________________
"DEPTH" COLUMN OF PILE DRIVING RECORD REFERENCED TO:
_____________________ CUT-OFF ELEVATION
_____________________ FINISH FLOOR ELEVATION
TIME: START DRIVING_______ FINISH DRIVING________ DRIVING TIME_________
INTERRUPTIONS (TIME, TIP ELEV. & REASON)__________________________________
JET PRESSURE & ELEVATIONS_________________________________________________
__________________________________________________________________________
__________________________________________________
DEPTH
NO. OF
DEPTH
NO. OF
DEPTH
NO. OF
FT.
BLOWS
FT.
BLOWS
FT.
BLOWS
__________________________________________________
0
_____
18
_____
36
_____
1
_____
19
_____
37
_____
2
_____
20
_____
38
_____
3
_____
21
_____
39
_____
4
_____
22
_____
40
_____
5
_____
23
_____
41
_____
6
_____
24
_____
42
_____
7
_____
25
_____
43
_____
8
_____
26
_____
44
_____
9
_____
27
_____
45
_____
10
_____
28
_____
46
_____
11
_____
29
_____
47
_____
12
_____
30
_____
48
_____
13
_____
31
_____
49
_____
14
_____
32
_____
50
_____
15
_____
33
_____
51
_____
16
_____
34
_____
52
_____
17
_____
35
_____
53
_____
SHEET 1 OF 2
SECTION 02395
Page 24