PILE DRIVING LOG
CONTRACT NO.________________________ CONTRACT NAME_______________________
CONTRACTOR_____________________________ TYPE OF PILE_____________________
PILE LOCATION_____________ PILE SIZE: BUTT/TIP: ________ LENGTH_________
GROUND ELEVATION_________________________ CUT OFF ELEVATION______________
PILE TIP ELEVATION_________________ VERTICAL (_____) BATTER 1 ON (_____)
SPLICES ELEVATION____________________ COMPANY____________________________
HAMMER:
MAKE & MODEL_________________ WT. RAM______________________
STROKE______________________ RAM RATED ENERGY__________________________
DESCRIPTION & DIMENSIONS OF DRIVING CAP_________________________________
CUSHION MATERIALS & THICKNESS___________________________________________
INSPECTOR_________________________________________________________________
"DEPTH" COLUMN OF PILE DRIVING RECORD REFERENCED TO:
_____________________ CUT-OFF ELEVATION
_____________________ FINISH FLOOR ELEVATION
TIME: START DRIVING_______ FINISH DRIVING________ DRIVING TIME_________
INTERRUPTIONS (TIME, TIP ELEV. & REASON)________________________________
JET PRESSURE & ELEVATIONS_________________________________________________
__________________________________________________________________________
__________________________________________________
DEPTH
NO. OF
DEPTH
NO. OF
DEPTH
NO. OF
M
BLOWS
M
BLOWS
M
BLOWS
__________________________________________________
0
_____
5.4
_____
10.8
_____
0.3
_____
5.7
_____
11.1
_____
0.6
_____
6.0
_____
11.4
_____
0.9
_____
6.3
_____
11.7
_____
1.2
_____
6.6
_____
12.0
_____
1.5
_____
6.9
_____
12.3
_____
1.8
_____
7.2
_____
12.6
_____
2.1
_____
7.5
_____
12.9
_____
2.4
_____
7.8
_____
13.2
_____
2.7
_____
8.1
_____
13.5
_____
3.0
_____
8.4
_____
13.8
_____
3.3
_____
8.7
_____
14.1
_____
3.6
_____
9.0
_____
14.4
_____
3.9
_____
9.3
_____
14.7
_____
4.2
_____
9.6
_____
15.0
_____
4.5
_____
9.9
_____
15.3
_____
4.8
_____
10.2
_____
15.6
_____
5.1
_____
10.5
_____
15.9
_____
SHEET 1 OF 2
SECTION 02395
Page 22