Home
Download PDF
Order CD-ROM
Order in Print
Home
>
UFGS Criteria Document Report
>
> RE-TREATMENT
VERIFICATION OF MEASUREMENT
02360
2360
Page Navigation
6
7
8
9
10
11
12
during the warranty period, the Contractor shall re-treat the site.
3.8
RE-TREATMENT
Where
re-treatment is required, the Contractor shall comply with the
requirements specified in paragraph
WARRANTY.
--
End
of Section --
SECTION
02360
Page
13