vents] [stoves] [plaques] [lockers] [mirrors] [bath accessories]
[partitions] [contents of cornerstones] [document boxes] [_____].
3.1.10
Mechanical Equipment
The following mechanical equipment shall be removed intact and salvaged:
[bathroom fixtures] [radiators] [registers and grilles] [fans] [______].
3.1.11
Electrical Equipment
The following electrical fixtures and equipment shall be removed intact and
salvaged: [light fixtures] [switches] [switch plates] [outlet covers]
[clocks] [telecommunications equipment] [______].
3.2
RECYCLED MATERIALS
Contractor shall recycle materials to the maximum extent possible. Removal
of recyclable materials shall be accomplished by hand labor wherever
possible. Historic portions of the structure to remain and items
identified for salvage shall not be damaged while removing materials for
recycling. The following materials shall be recycled: [dimension lumber]
[scrap wood] [paper and cardboard] [gypsum wallboard] [asphalt] [rubble]
[glass] [metals] [_____].
3.3
DISPOSITION OF MATERIALS
Title to materials and equipment to be demolished, except Government and
using service salvage and historical items, is vested in the Contractor
upon receipt of notice to proceed. The Government will not be responsible
for the condition, loss or damage to such property after notice to proceed.
3.3.1
Material Salvaged for the Contractor
Material salvaged for the Contractor shall be temporarily stored as
approved by the Contracting Officer and shall be removed from Government
property before completion of the contract. Material salvaged for the
Contractor shall not be sold on the site.
3.3.2
Items Salvaged for the Government
Salvaged items to remain the property of the Government shall be removed in
a manner to prevent damage and as directed by the Contracting Officer,
shall be packed or crated to protect the items from damage. Items damaged
during removal or storage shall be repaired or replaced to match existing
items. Containers shall be properly identified as to contents. The
following items reserved as property of the Government shall be delivered
to the areas designated: [_____].
3.3.3
Items Salvaged for the Using Service
The following items reserved as property of the using service will be
removed prior to commencement of work under this contract: [_____].
3.4
CLEAN-UP
Upon completion of the work, portions of structure to remain and adjacent
areas and structures shall be cleaned of dust, dirt, and debris caused by
salvage and demolition operations. Debris and rubbish shall be removed and
transported in a manner that prevents spillage on streets or adjacent
SECTION 02226