to the maximum extent possible. Care shall be taken to not damage historic
portions of the structure to remain or items identified for salvage.
Furnishings, equipment, and materials not scheduled for salvage or
recycling shall be removed prior to any salvaging procedures. Contractor
shall keep a complete recording of all salvaged materials including the
condition of such materials before, and after, salvage operations.
3.1.1
Site Work
The following site items shall be removed intact and salvaged: [fences and
gates] [site furnishings] [fountains] [sculpture] [site ornaments] [site
3.1.2
Concrete
The following concrete items shall be removed intact and salvaged: [precast
architectural elements] [_____].
3.1.3
Masonry
The following masonry items shall be removed intact and salvaged: [brick]
[stone] [terra cotta] [cast stone] [clay tile trim elements] [cornerstones]
[_____].
3.1.4
Metals
The following metal items shall be removed intact and salvaged: [ladders]
[stairs and handrails] [cast architectural ornament] [architectural
metalwork] [ornamental ironwork] [gratings and metal walkways] [_____].
3.1.5
Wood
The following materials shall be removed intact and salvaged: [wood
decking] [millwork] [custom paneling] [wood stairs and handrails] [ladders]
[architectural woodwork] [custom casework] [wood timbers (125 x 125 mm 5 x
5 inch or larger)] [_____].
3.1.6
Thermal and Moisture Protection
The following materials shall be removed intact and salvaged: [slate
tiles] [clay tiles] [gutters, leaders, and downspouts] [skylights] [roof
accessories] [exterior siding] [______].
3.1.7
Doors and Windows
Doors and windows with associated hardware and operating mechanisms shall
be removed intact (including glass) and salvaged per schedule.
3.1.8
The following special or historic finishes shall be [protected] [removed]
and remain intact: [stencilling] [decorative tile] [molded ornament]
[decorative ceiling materials] [wood flooring] [textured wall coverings]
[murals] [_____].
3.1.9
Equipment and Specialty Items
The following equipment and specialty items shall be removed intact and
salvaged: [chalkboards and tackboards] [toilet partitions] [louvers and
SECTION 02226
Page 6