**************************************************************************
USACE / NAVFAC / AFCESA
UFGS-01451A (January 2003)
--------------------------
Preparing Activity: USACE
Superseding
UFGS-01451A (October 2002)
UNIFIED FACILITIES GUIDE SPECIFICATIONS
References are in agreement with UMRL dated 23 June 2005
Latest change indicated by CHG tags
**************************************************************************
SECTION 01451A
CONTRACTOR QUALITY CONTROL
01/03
**************************************************************************
NOTE: This guide specification covers requirements
for Contractor Quality Control for construction
projects or design-build construction projects.
Comments and suggestions on this guide specification
are welcome and should be directed to the technical
proponent of the specification. A listing of
technical proponents, including their organization
designation and telephone number, is on the Internet.
Recommended changes to a UFGS should be submitted as
a Criteria Change Request (CCR).
Use of electronic communication is encouraged.
Brackets are used in the text to indicate designer
choices or locations where text must be supplied by
the designer.
This guide specification includes tailoring options
for construction projects and design-build
construction projects. Selection or deselection of
a tailoring option will include or exclude that
option in the section, but editing the resulting
section to fit the project is still required.
**************************************************************************
PART 1
GENERAL
1.1
REFERENCES
**************************************************************************
NOTE: Issue (date) of references included in
provided by the latest guide specification. Use of
SpecsIntact automated reference checking is
recommended for projects based on older guide
specifications.
SECTION 01451A
Page 3